Quire Paper / Technical & professional / Multi-Project Change Order Log
For Excel & Google Sheets

One job's CO log is job control. Every job's COs in one book is how the office stops leaking money.

Change orders don't hurt you one at a time — they hurt you in the aggregate, across five jobs at once: the CO that went out three weeks ago and never came back signed, the extra work that started before anyone approved it, the approved CO that never made it onto a pay application. This log is the office-wide register: every project's change orders in one book, each row carrying its cost impact, schedule impact, and a status that drives everything — Draft and Submitted roll into PENDING EXPOSURE (work you may be doing with no signature behind it), Approved rolls the project's contract forward, and approved-but-unbilled rows flag red until they land on a pay app. A By-Project tab reads it all live: original contract + approved COs = revised contract, per project, with approval rate and pending exposure beside it. Every formula independently verified. To be clear about what you're buying: a tracking and documentation tool — not contract or legal advice. Your contract and its change-order procedures govern what constitutes a change, how it's priced, and who approves it; this book makes sure nothing falls through the cracks.

Available soon See what's inside
Excel & Google Sheets · pure formulas, no macros70-row cross-project CO register · per-project contract roll-forward · pending exposure · unbilled flagsA tracking tool — your contract's change-order procedures govern
Multi-Project Change Order Log cover

Pending exposure is the number to watch.
It's the work that's underway before it's signed.

The actual workbook

This is the dashboard itself — not a mockup.

As it opens in Excel or Google Sheets: the pending-exposure and approved-CO-value heroes, the verdict strip (the pipeline, the money, the portfolio), the 6-KPI ribbon, the by-status pipeline next to the projects carrying the most pending exposure, and the contract roll-forward across the whole office.

Multi-Project Change Order Log — the actual workbook, full size
Shown with the included sample office — 6 projects and 28 change orders, including a deductive CO, two rejections, a voided scope, and $30,300 approved but not yet billed. Every figure is illustrative and user-supplied; overwrite the green cells with your own projects and it all recalculates.
How it works

Log every CO once. The office view builds itself.

One register in, the roll-forward and the exposure out.

01

Set up the projects

Projects tab: one row per project — name, client, ORIGINAL contract amount, Active or Closed. The register dropdown and every rollup read from here.

02

Log the change order

CO Register: date, project, your CO number, description, cost impact (deductive COs are just negative), schedule impact in days, and the status — Draft, Submitted, Approved, Rejected, or Void.

03

Watch the pipeline age

Submitted rows tint amber and age against the green as-of date in the DAYS column — the CO that's been out for signature 38 days stops hiding.

04

Flip it when it signs

Mark it Approved with the date, and the project's revised contract rolls forward instantly. Then set BILLED? once it's on a pay application — approved-but-unbilled rows flag red until you do.

05

Read the roll-forward

By Project: original contract + approved COs = revised contract, per project — with pending exposure, unbilled dollars, schedule days added, and approval rate on the same row.

06

Then run each job's budget

This is the office view. For one job's budget-vs-actual — where approved COs revise that job's budget by cost division — the Job Costing & Budget-vs-Actual Tracker is the job-control side. They pair; they don't overlap.

What's inside

Five tabs. Zero macros. Every number a live formula.

  • DashboardPENDING EXPOSURE and APPROVED CO VALUE heroes, three verdicts (the pipeline, the money, the portfolio), a 6-KPI ribbon (approval rate, avg days to approval, unbilled, schedule days added), the by-status pipeline, top pending exposure by project, and the contract roll-forward strip.
  • CO Register — 70 rowsDate, project dropdown, CO #, description, cost impact, schedule days, status, date approved, billed flag, and an auto DAYS column. Submitted tints amber, Draft tints blue, Rejected and Void grey out, approved-but-unbilled flags red.
  • By ProjectPer project, all live: original contract, COs logged, approved CO value, REVISED CONTRACT, pending exposure, approved-unbilled, schedule days added, approval rate — plus ALL PROJECTS totals and two register checks that catch typo'd project names.
  • ProjectsTwelve project slots — name, client, original contract, Active/Closed, notes. Keep closed projects on the list so the history stays honest.
  • How to UseThe five statuses explained, the two numbers that matter, the office-view-vs-job-budget distinction, and the unlock password. Protected everywhere except the green cells.
Inside Multi-Project Change Order Log
Get it now
$16 · one-time

Multi-Project Change Order Log

One-time $16. Part of the Contractor Office shelf: this is the office-wide CO book, the Job Costing & Budget-vs-Actual Tracker runs each job's budget (with its own per-job CO tab), the T&M / Extra Work Log captures the extra work before it even becomes a CO, and the Payment Application (G702/G703-style) is where approved COs get billed.

Available soon
Instant download · Personal/single-business license · A tracking & documentation tool — NOT contract or legal advice. Your contract and its change-order procedures govern what constitutes a change, pricing and markup, notice deadlines, and approval authority. Sample data is illustrative only.
More from Quire Paper

You might also like

License Tracker — the file
New

License Tracker

Every professional license across all 50 states on one dashboard — with a US map that heat-shades by license count.

$19Excel dashboard · .xlsx
Loan Amortization Calculator — the file
New

Loan Amortization Calculator

Payment, payoff date, and every month in between — plus what an extra payment really saves you. Works for any fixed-rate loan.

$9Excel & Google Sheets · .xlsx
13-Week Cash Flow Forecast — the file
New

13-Week Cash Flow Forecast

Thirteen weeks of cash in and cash out, rolled into a live ending-cash line — the week it gets tight flags itself. Lowest-point marker, below-cushion ambers, negative reds, and a dashboard that reads the whole quarter. The standard rolling small-business cash tool, built as a formula engine.

$19Excel dashboard · .xlsx
52-Week Toolbox Talk System — the file
Now editable · $39

52-Week Toolbox Talk System

A full year of designed two-minute safety talks — 52 one-page talks, each with a matching sign-in + quiz record sheet, an annual topic calendar, and the delivery method. Now with every talk as an editable PowerPoint deck and Word sheet, so you can put your company on it.

$39Printable PDF + editable PowerPoint & Word · 108 pages + 52 decks · US Letter
52-Week Toolbox Talk System — Spanish Edition — the file
New

52-Week Toolbox Talk System — Spanish Edition

The Spanish edition of our 52-Week Toolbox Talk System: a full year of designed, two-minute jobsite safety talks — in Spanish — each with a matching sign-in + quiz record sheet, an annual topic calendar, and a delivery guide. For crews that run their talks in Spanish. Charlas de seguridad, listas para leer.

$29Spanish · printable PDF · 108 pages · Letter · .pdf
Auto Detailing Business Kit — the file
New

Auto Detailing Business Kit

The detailer's menu and book. Every package on the menu shows EARNS PER HOUR — price minus products, divided by the hours it honestly takes — against your target rate, with the price that would fix it beside it. The job log carries ACTUAL hours so each job's real $/hr is truth, not estimate; customers fill themselves (jobs, revenue, last visit, who owes, who's a Regular). The sample's twist is the industry's: the SUV full detail earns the most money and the worst hourly. A pricing & record-keeping tool, not business advice.

$16Excel & Google Sheets · service menu + job log + customers · .xlsx
Bar & Pub Beverage Program Kit — the file
New

Bar & Pub Beverage Program Kit

The bar's numbers, poured honestly. Every drink costed BY THE OUNCE from its actual pour lines — the spirit, the mixer, the fresh juice, the garnish — and read against your target pour cost: the sample's premium paloma runs 28% against a 24% target and reads red, which is exactly the pour this sheet exists to catch. Your busy night priced from the real mix (units × each drink's honest margin — the IPA quietly out-earns the $14 martini), and the walk-in count turned straight into a priced order: set the par once, count what's on hand, the order writes itself. Reprice a bottle and the whole list re-reads. A pricing & record-keeping tool — liquor licensing, service rules, and dram-shop liability are your own.

$19Excel & Google Sheets · pour costing + night mix + par & order · .xlsx
Bid & Estimate Tracker — the file
New · $19

Bid & Estimate Tracker

Every bid on one dashboard — pipeline value, hit rate, what's due in the next two weeks — plus a line-item estimate worksheet that builds the bid price itself, from divisions to overhead, profit, and contingency.

$19Excel & Google Sheets (.xlsx) — formula-only, no macros
Bid Tab / Bid Leveling Sheet — the file
New

Bid Tab / Bid Leveling Sheet

Raw totals lie — the cheapest-looking bid is often just the emptiest one. Compare 4–6 sub or vendor bids line-by-line across your scope items, plug the gaps where a bidder excluded or no-bid a line, and read leveled totals that carry the SAME scope for every bidder — with auto low/high/spread per line, red scope-gap flags, a leveled ranking, and an exclusions log. Four tabs, pure formulas, no macros.

$19Excel & Google Sheets · bid tabulation + leveling engine · .xlsx
Booth Renter Books — the file
New

Booth Renter Books

The chair renter's books. Every service and tip logged once; weekly booth rent that ACCRUES ITSELF from your start date — so 'am I behind on the chair?' and 'what % of my take does the chair eat?' are always answered; a menu that knows what each service EARNS PER HOUR after product (in the sample, root color is both the most-booked service and the worst hourly — the classic chair truth); and the number that matters: TAKE-HOME, cash in minus cash out, with pricing estimates never double-counting against real purchases. A record-keeping tool — your salon agreement, state board, and tax professional govern.

$14Excel & Google Sheets · service log + chair engine + menu economics · .xlsx
Budget by Paycheck — the file
New

Budget by Paycheck

Give every bill a paycheck and see exactly what's safe to spend from each check — 26 paychecks mapped, a 60-bill register, and one dark dashboard that does the math.

$14Excel & Google Sheets · .xlsx
Car Flipping Tracker — the file
New

Car Flipping Tracker

The flipper's honest book. Every car carries its ALL-IN — buy price plus every recon receipt, logged as it happens (the $40 parts runs are what the costs log exists to catch) — so NET on the sale is real, red when a flip lost money. DAYS HELD runs live on unsold cars, amber past your sitter dial, and the dashboard carries the number flippers feel but never see: CASH IN THE DRIVEWAY. The sample includes the diesel sedan that needed a transmission and finished $1,085 down — keeping the losers visible is the whole discipline. A record-keeping tool; state DMV flip caps and dealer-license rules govern.

$14Excel & Google Sheets · flips register + recon costs log · .xlsx
Catering & Food Pricing Calculator — the file
New

Catering & Food Pricing Calculator

The food-cost chain, live end to end: ingredient unit costs (buy by the case, cost by the pound) → recipe cost per serving → TRUE cost with labor and packaging → food-cost % flagged red the moment a recipe runs over YOUR target → the price your own target implies — plus an event calculator that costs a whole job (menu × guests + staff + extras) against your quote before you sign it, and an event log with margin per event. Change one case price and everything re-costs itself.

$16Excel & Google Sheets · ingredient costing + recipe pricing + event calculator · .xlsx
Certified Payroll WH-347 Prep Workbook — the file
New

Certified Payroll WH-347 Prep Workbook

Every Davis-Bacon job means certified payroll every week — and the WH-347 is a slow form to fill from scratch. This workbook organizes the week the way the form reads: classification rates you set once, O/S daily hours per worker, auto gross (ST × base + OT × 1.5 × base), fringe obligation, deductions to net — then a Statement-of-Compliance prep checklist, a multi-week log, and a dashboard. Transfer line by line to the official DOL form. A prep aid — not the form itself.

$24Excel & Google Sheets · WH-347-shaped weekly payroll engine · .xlsx
Church Treasurer Kit — 2026 — the file
New

Church Treasurer Kit — 2026

The volunteer treasurer's workbook for a small church or ministry. A contributions log with per-household and per-fund rollups, a member directory, designated-fund tracking (beginning balance + gifts in − spending out), a budget whose monthly columns fill themselves from the expense log — and the January job done: a year-end giving statement that generates itself for any household you pick, print-ready. A record-keeping tool, not tax or accounting advice.

$19Excel & Google Sheets · contributions log + giving statements + funds + budget · .xlsx
Cleaning Business Kit — the file
New

Cleaning Business Kit

The cleaning business's whole paper trail. Every home carries its clean rate AND its honest minutes — door to door, setup and load-out included — so $/HR per house is finally visible, and the sprawler that grew a sunroom since you quoted it gets named in red ('$43/hr · reprice?'). A ten-second job log keeps every clean, deep clean, and move-out with its paid/unpaid truth; the quote builder prices deep cleans and move-outs as supplies + hours × your target, with the client's budget read against it. Airbnb turnovers log the same way. A pricing & record-keeping tool — bonding, insurance, and what you charge are your own.

$16Excel & Google Sheets · homes register + job log + quote builder · .xlsx
Coffee Shop Drink Costing Calculator — the file
New

Coffee Shop Drink Costing Calculator

The espresso bar's costing engine. Every drink is built from its real ingredient lines — beans by the shot, milk by the ounce, syrup by the pump, and the cup, lid, sleeve, straw, and ice, because packaging is where cup costs hide — then read against YOUR target COGS %. The DAY MIX prices your typical morning: units per drink → the day's revenue, cost, and gross margin, scaled to the week, month, and year. The sample's lesson: the $7.25 iced oat vanilla latte carries the worst COGS on the board. Reprice oat milk once and the whole board re-reads. A pricing tool, not business or food-safety advice.

$16Excel & Google Sheets · cup costs + menu margins + day mix · .xlsx
Construction Company Bookkeeping — Job-Aware Books — the file
New

Construction Company Bookkeeping — Job-Aware Books

Bookkeeping built the way construction money actually moves: every transaction carries a JOB code, so the same two ledgers produce a By-Job P&L (billed, direct costs by category, gross profit, margin — per job), a cash-basis Monthly P&L with overhead as its own honest line, and a dashboard that names your best and worst jobs. One sample job loses money on purpose — that red row is the point. A record-keeping tool, not accounting advice.

$24Excel & Google Sheets · two ledgers + By-Job P&L + Monthly P&L · .xlsx
Construction Loan Draw Schedule + Interest Tracker — the file
New

Construction Loan Draw Schedule + Interest Tracker

A construction loan doesn't fund all at once — it funds draw by draw, and it charges interest on every dollar the day it lands. This workbook runs the whole loan: an earned-value draw schedule by construction phase (budget × % complete − previously drawn = this draw request), a draw log with a live actual/365 interest-carry chain, and a dashboard reading utilization, remaining availability, interest vs reserve, and pending draws. Five tabs, pure formulas, no macros.

$22Excel & Google Sheets · draw schedule + interest-carry engine · .xlsx
Construction Payment Application + Schedule of Values — the file
New

Construction Payment Application + Schedule of Values

Bill a progress payment in minutes — an original AIA-style application for payment with a schedule of values, retainage on work and stored materials, and change-order math that ties out to the cent. The application foots every time.

$27Excel dashboard · .xlsx
Construction Proposal + Scope of Work — the file
New

Construction Proposal + Scope of Work

The proposal that wins the job and prevents the fight: real scope-of-work language written trade by trade, an exclusions page that stops the "I assumed that was included" conversation, and an Excel pricing worksheet that generates every number the proposal quotes.

$14Editable Word + Excel pricing worksheet · .docx + .xlsx + sample PDF (zip)
Daily Construction Report — the file
New

Daily Construction Report

A superintendent's daily field log: one row per day — weather, crew, man-hours, deliveries, delays, safety — that rolls up to man-hours, lost days, and delay causes on a live dashboard, plus a print-ready daily report form for the trailer.

$14Excel · daily log + printable form · .xlsx
Daycare Provider Kit — the file
New

Daycare Provider Kit

The childcare provider's money book. A per-child tuition ledger where billed, paid, balance, and Current/Behind/Delinquent status compute inside each child's ENROLLMENT WINDOW — a March start bills from March, a May withdrawal stops in May, automatically. Monthly subsidy/discount tracking, user-set late fees and delinquency threshold, a program expense log, and a dashboard with the roll, the spots filled against your capacity, and the month. A record-keeping tool, not tax or licensing advice.

$16Excel & Google Sheets · per-child tuition ledger + enrollment windows + expense log · .xlsx
Debt Payoff Dashboard — the file
New

Debt Payoff Dashboard

List up to 20 debts, pick snowball or avalanche — see your debt-free date and the interest you'll never pay.

$12Excel & Google Sheets · .xlsx
Direct Booking Kit — the file
Flagship · $349

Direct Booking Kit

Take bookings on your own site and keep the fees: a complete direct-booking website for short-term rentals — live calendar, card payments, Airbnb & VRBO sync, demand pricing, and a real automation API. You own the code; no monthly SaaS. One repeat guest a year pays for it.

$349Complete booking website · one-time license
Dog Breeder Litter & Financial Dashboard — the file
New

Dog Breeder Litter & Financial Dashboard

The kennel's book, honestly kept. Each litter from whelp to go-home — the go-home date computes from your contract's dial, and THE NEXT GO-HOME is named on the dashboard. Each puppy's placement and honest balance: a Reserved balance is due at go-home (normal, amber); a SOLD balance means the puppy went home before the money did — the sample's teal boy left in June with $800 open, and it reads red until it's settled. Expenses tagged per litter — health testing as a first-class category, stud fees, vet and whelping — so each litter nets honestly, and a young litter reads negative before pickup week because that's the truth. A record-keeping tool — breeder licensing, kennel regulations, and animal care are your own.

$16Excel & Google Sheets · litters + puppy sales + per-litter expenses · .xlsx
Farm & Ranch Bookkeeping — 2026 — the file
New

Farm & Ranch Bookkeeping — 2026

Enterprise-aware books for a farm or ranch. Two ledgers where every dollar carries an enterprise code — corn, beef cattle, custom work, or farm-wide GENERAL — so the same entries produce a by-enterprise P&L (which crop or herd actually made money), a cash-basis monthly P&L that shows the spring squeeze honestly, and a Schedule-F-shaped year summary your tax preparer can work from, with equipment purchases tracked but broken out, never quietly expensed. A record-keeping tool, not tax advice.

$19Excel & Google Sheets · enterprise-coded ledgers + by-enterprise P&L + Schedule-F-shaped summary · .xlsx
Farmers Market & Craft Show Vendor Kit — the file
New

Farmers Market & Craft Show Vendor Kit

The maker's season, honestly netted. Every product costed FROM ITS ACTUAL MATERIALS — the wax, the jar, the wick, the label — and read against your target materials share: the sample's room spray runs 26% against a 25% target and reads red, which is exactly the product this sheet exists to catch. Every market day netted against its booth fee, so the art walk that cost $175 to attend and sold $140 reads as what it was — and doesn't get booked again next year. Plus the real cash: materials purchases, packaging, the canopy, memberships. Reprice one supplier pack and the whole table re-reads. A pricing & record-keeping tool — cottage-food rules, product labeling, and sales-tax permits vary by state and are your own.

$16Excel & Google Sheets · product costing + market log + expenses · .xlsx
Fix & Flip / BRRRR Deal Analyzer + Rehab Budget — the file
New

Fix & Flip / BRRRR Deal Analyzer + Rehab Budget

One model, two exits: run a Fix & Flip and a BRRRR off the same numbers — net profit, ROI, the 70% rule, cash-out refinance, cash flow, and cash-on-cash — fed by a rehab budget you estimate the way a contractor does, by construction division. Four tabs, pure formulas, no macros.

$27Excel · deal analyzer + rehab budget · .xlsx
Fleet & Equipment Maintenance Tracker — the file
New

Fleet & Equipment Maintenance Tracker

A LIVE maintenance schedule for a small fleet. Miles-, hours-, and months-based intervals checked against each unit's real odometer, hour meter, or the calendar — every task reads OK, DUE SOON (amber), or OVERDUE (red) at warning windows you set. A service log feeds per-unit costs and the spend trend. Free maintenance spreadsheets exist; this one is live math, not a form. A scheduling aid — not a DOT/FMCSA/OSHA compliance record; manufacturer intervals and your regulator govern.

$14Excel & Google Sheets · live maintenance schedule + service log + per-unit costs · .xlsx
Food Truck Kit — the file
New

Food Truck Kit

The truck's two money questions in one file. Does each PLATE earn its keep — ingredients priced by the portion, the tortilla, and the boat (packaging is where truck margins hide), read against your target COGS with 'OVER — rework?' in red. And does each GIG earn its fee — the log where every outing nets its sales against the booth fee, so the festival that cost $400 to attend and sold $310 reads as what it was, and never gets booked again by accident. Real expenses (commissary, propane, permits) keep the season's cash honest. A pricing & record-keeping tool — health permits and commissary rules vary by county.

$16Excel & Google Sheets · plate costing + gig log + season P&L · .xlsx
Freelancer Rate & Profitability Calculator — the file
New

Freelancer Rate & Profitability Calculator

Stop guessing your rate. Back into the hourly, day, and week rate you must charge — from what you want to take home, your overhead, your tax set-aside, and your REAL billable hours — then log each project to see whether it actually hit that rate. Three tabs, pure formulas, no macros.

$16Excel & Google Sheets · rate calculator + project tracker · .xlsx
Gentle Goals — the file
Daily Reset line

Gentle Goals

A 12-week goal workbook held lightly: tiny-rung ladders, light weekly check-ins, and a mid-season permission slip. From our Daily Reset line.

$12Printable PDF · US Letter
Gym Membership & Dues Tracker — the file
New

Gym Membership & Dues Tracker

The small gym's ledger. Name, plan, rate, join date — and DUES ACCRUE THEMSELVES, months on the roster × the rate, so every member's balance is honest without ever writing an invoice: red when someone's quietly behind, negative when they've paid ahead. The dashboard carries MRR and the annual run rate, names THE QUIET LAPSE by member and amount, and the by-plan table shows what actually carries the recurring revenue. Fits gyms, studios, dojos, clubs, and co-ops the same. A record-keeping tool — membership agreements, waivers, and state auto-renewal laws are your own.

$14Excel & Google Sheets · roster + self-accruing dues + payments · .xlsx
HOA Treasurer Kit — the file
New

HOA Treasurer Kit

The volunteer treasurer's workbook for a small self-managed HOA or condo association. A per-unit dues register (monthly or quarterly assessments, a Jan–Dec payment grid, auto billed/paid/balance and Current/Late/Delinquent status at YOUR threshold), budget vs actual with over-pace flags, a reserve-fund tracker measured against your own reserve-study target, and a print-ready Board One-Pager — the sheet you hand the board every month. A record-keeping tool, not accounting or legal advice.

$22Excel & Google Sheets · dues register + budget + reserve tracker + board one-pager · .xlsx
Home Bakery Kit — Orders, Recipe Costs & the Books — the file
New

Home Bakery Kit — Orders, Recipe Costs & the Books

The home baker's order book and pricing engine, chained live: ingredients cost the recipes, recipes cost the orders. Every custom order carries its due date (amber inside your window, red past due), deposit, balance (a delivered order still owing reads red — collect at pickup), and an honest estimated margin — the $85 cake that cost $43 to make. The sample even includes a $5.50 sourdough loaf that loses money once your hands are counted. A pricing & record-keeping tool — your state's cottage food law governs.

$18Excel & Google Sheets · order book + recipe costing + expenses · .xlsx
Home Renovation Budget & Project Tracker — the file
New

Home Renovation Budget & Project Tracker

A renovation budget built the way an architect phases a project — by trade, in build order, with room tags. Contingency held on top, planned-vs-actual variance, contractor-quote comparison, and a payments log that knows what you still owe. Five tabs, pure formulas, no macros.

$16Excel & Google Sheets · budget + quotes + payments · .xlsx
Homeowner Ops Kit — Maintenance Schedule + Home Inventory — the file
New

Homeowner Ops Kit — Maintenance Schedule + Home Inventory

The three records every house should have: a maintenance schedule with a live due engine (45 curated tasks — roof, envelope, mechanicals), an insurance-ready home inventory with replacement value by category, and a service log that proves the house has been cared for. Four working tabs, pure formulas, no macros.

$14Excel & Google Sheets · maintenance + inventory + service log · .xlsx
Horse Boarding Kit — the file
New

Horse Boarding Kit

The boarding barn's ledger. BOARD accrues itself — months on the books × each horse's rate — and the EXTRAS LOG catches the quiet revenue barns forget to bill: the $25 farrier holds, the training rides, the blanket service. Every owner's balance stays honest (board + extras − payments, red when a family owes), the dashboard names the balance to chase by horse and owner, and the by-type table shows what full board vs pasture vs training actually carries. A record-keeping tool — your boarding contract and state equine liability statute govern; not veterinary or care advice.

$16Excel & Google Sheets · boarder ledger + extras log + payments · .xlsx
Interior Design Client & Fee Pack — the file
New

Interior Design Client & Fee Pack

The business side of a design practice, already written: client welcome letter, design services proposal with a phase-by-phase scope and investment table, a fee-schedule one-pager (flat, hourly, and cost-plus side by side), scope of services & boundaries, a client questionnaire that mirrors our Interior Design Project Workbook, a project timeline letter, and payment terms with a two-step late-payment reminder pair. Replace the blue example text with your studio's details.

$16Editable Word (.docx) template set + sample PDF · Google Docs compatible
Interior Design Project Workbook — the file
New

Interior Design Project Workbook

The design file with real numbers: an FF&E schedule that costs itself (qty × unit → extended price, procurement status), a room-by-surface finish schedule, a budget that pulls its actuals straight from your FF&E selections, a client intake questionnaire, and a live rollup dashboard. Six tabs, pure formulas, no macros.

$24Excel & Google Sheets · FF&E + finish schedule + budget · .xlsx
Invoice Generator + Tracker — the file
New

Invoice Generator + Tracker

Send a clean invoice — and always know who still owes you. A fillable, printable invoice plus a tracker that shows what's outstanding, what's overdue, and what got paid this month, with an aging breakdown. No subscription, no per-invoice fee.

$14Excel · .xlsx
Job Costing Tracker — the file
New · $24

Job Costing Tracker

Every project's budget, committed costs, and actuals on one dark dashboard — cost to complete, projected at completion, and the margin you're actually going to make, by cost division, with OK / WATCH / OVER status on every line.

$24Excel & Google Sheets (.xlsx) — formula-only, no macros
Jobsite Safety Forms Pack — the file
New · $12

Jobsite Safety Forms Pack

Ten photocopy-ready forms that run the documentation layer of a jobsite safety program — inspections, incidents, near misses, pre-task plans, orientation, and the logs in between. PDF plus editable Word versions of every form.

$12Printable PDF (US Letter + A4) + 10 editable Word templates
Landlord / Rental Property Management Tracker — the file
New

Landlord / Rental Property Management Tracker

Your whole rental portfolio in one workbook: a rent roll (with a live lease-expiration engine), a rent ledger, and a maintenance log that roll up to occupancy, collections, expiring leases, and open repairs on one dashboard. For small-portfolio, long-term-rental landlords.

$19Excel dashboard · .xlsx
Lawn Care & Landscaping Business Kit — the file
New

Lawn Care & Landscaping Business Kit

The route's whole paper trail. Every yard carries its mow rate AND its honest minutes — gate to gate, trimming included — so $/HR per yard is finally visible, and the corner lot that takes 70 minutes at a 30-minute price gets named in red ('$51/hr · reprice?'). A ten-second job log keeps every mow, mulch, and cleanup with its paid/unpaid truth; the quote builder prices extra work as materials + hours × your target, with the client's budget read against it before you say a number out loud. A pricing & record-keeping tool — chemical applications are licensed work in most states; your rules and prices are your own.

$16Excel & Google Sheets · yards register + job log + quote builder · .xlsx
Lease Renewal Tracker — the file
New

Lease Renewal Tracker

Every lease's days-to-end and status — Active, Renewal window, Expiring soon, Expired, Month-to-month — plus your renewal offers, the tenants' responses, the auto % increase, and a notice-deadline timeline for every unit. The renewal season, run from one workbook.

$12Excel dashboard · .xlsx
Maker Pricing Calculator — the file
New

Maker Pricing Calculator

Price handmade work honestly. Material unit costs (buy the case, cost the unit) → true cost with YOUR labor and packaging → what's actually left after the sales channel's fees — per product, on the channel it really sells on — plus the fee-aware price your own target margin implies, and EARNS/HR: what a sale actually pays your hands. The sample's sticker sheet loses money after fees on purpose; that red row is the pitch. Pairs with the Reseller Tracker (this prices before you sell; that tracks profit after).

$12Excel & Google Sheets · material costing + fee-aware pricing + earns-per-hour · .xlsx
Massage Therapy Client & Session Tracker — the file
New

Massage Therapy Client & Session Tracker

The practice book for massage and bodywork. Every session logged in ten seconds — date, client, modality, with the rate pulled from the roster (override any row for comps, member rates, and intro promos). Every package counted down IN SESSIONS: purchased vs received, amber when it's time for the renew talk, red once a client is past the package — the sample's client is 9 sessions past and owes $990, which is exactly the drift this sheet exists to stop. Balances net billed against paid; package credit sits as negative, which is what it is. Works for solo LMTs, bodywork studios, and spa suites. A record-keeping tool — treatment, intake screening, consent, and scope of practice are your professional territory.

$14Excel & Google Sheets · session log + package countdowns + balances · .xlsx
Move-In / Move-Out Inspection Checklist — the file
New

Move-In / Move-Out Inspection Checklist

60 items, room by room — rated Good / Fair / Poor at move-in and again at move-out, with automatic CHANGED flags when condition comes back worse, your proposed tenant charges, and a deduction summary against the deposit. The walk-through, documented properly.

$12Excel dashboard · .xlsx
Music Teacher Studio & Lesson Tracker — the file
New

Music Teacher Studio & Lesson Tracker

The music studio's book. Every lesson logged in ten seconds — date, student, instrument, with the rate pulled from the roster (override any row for make-ups, sibling rates, and recital comps). Every package counted down IN LESSONS: purchased vs taught, amber when it's time for the renew talk, red once a student is past the package — the sample's student is 9 lessons past and owes $495, which is exactly the drift this sheet exists to stop. Balances net billed against paid; package credit sits as negative, which is what it is. Works for piano, violin, guitar, voice, drums — any studio. A record-keeping tool — rates, studio policies, and teaching are your own.

$14Excel & Google Sheets · lesson log + package countdowns + balances · .xlsx
New Home Construction Budget — Owner-Builder — the file
New

New Home Construction Budget — Owner-Builder

Cost control for building a house: sixteen phases from sitework to landscaping, budget → committed → actual → forecast on every line, a construction-loan draw log, and the out-of-pocket number owner-builders feel but rarely see. Five tabs, pure formulas, no macros.

$22Excel & Google Sheets · budget + draws + payments · .xlsx
Nonprofit Grant Tracker — the file
New

Nonprofit Grant Tracker

The small nonprofit's grant book. Every award carries its restriction, its honest SPENT and REMAINING from a receipt-level spending log, and its reporting deadline — amber inside your warning window, RED past due, because a missed report is the failure mode that costs renewals. The dashboard separates the number that keeps organizations honest: RESTRICTED LEFT — money spendable only per its award letter, never quietly absorbed into operations. The pipeline tracks applications from research to decision with the win rate. A record-keeping tool — the award letter governs allowable costs; filings belong with your tax professional.

$16Excel & Google Sheets · grants register + spending log + pipeline · .xlsx
Notary & Loan Signing Agent Business Kit — the file
New

Notary & Loan Signing Agent Business Kit

The business side of a mobile notary / signing agent practice, in one workbook: a Signing Log (fee, miles, travel time, payment status) that feeds income by month, by signing type, and by client; an Expense Log with a live category rollup; and a mileage engine that turns your driving into an estimated deduction at a rate YOU set. Not an official notary journal — keep your state-required journal separately.

$16Excel & Google Sheets · signing log + income + expenses + mileage engine · .xlsx
One Thousand Stories — Family Digital Legacy Kit — the file
New · $19

One Thousand Stories — Family Digital Legacy Kit

A repeatable method for capturing a person's memories, voice, and wisdom before the window closes — interview frameworks, a question bank for a year of Sundays, the archive system, and an honest guide to the AI layer on top.

$19Printable PDF guide (23 pages) + editable Word templates
Party & Equipment Rental Kit — the file
New

Party & Equipment Rental Kit

The booking book for a party or event-equipment rental business. A booking log with deposits, balances, and a live OUTSTANDING per event (past-event unpaid flags red); per-line booking items that drive per-item earnings and utilization; an inventory tab that doubles as an availability checker — pick any date and see what's booked, what's free, and what's OVERBOOKED in red; plus an expense log and a season dashboard that names your peak month and your best earner per unit owned.

$19Excel & Google Sheets · booking log + inventory & availability + per-item earnings + season P&L · .xlsx
Personal Trainer Client & Session Tracker — the file
New

Personal Trainer Client & Session Tracker

The trainer's practice book. Every session logged in ten seconds — date, client, focus, with the rate pulled from the roster (override any row for comps and promos). Every pack counted down IN SESSIONS: purchased vs trained, amber when it's time for the renew talk, red once you're training past the pack — the sample's client is 8 sessions past and owes $520, which is exactly the drift this sheet exists to stop. Balances net billed against paid; pack credit sits as negative, which is what it is. Works for trainers, coaches, and small studios. A record-keeping tool — programming, screening, and waivers are your professional territory.

$14Excel & Google Sheets · session log + pack countdowns + balances · .xlsx
Pet-Sitting & Dog-Walking Business Kit — the file
New

Pet-Sitting & Dog-Walking Business Kit

The books-and-bookings workbook for a pet-sitting or dog-walking business. One visit log drives everything: per-client BALANCES DUE that turn red the moment someone owes you (the loop the booking trackers never close), per-service earnings, a mileage total with an estimated deduction at your own rate, an expense log, and a season dashboard. Unpaid visits tint amber; comp visits stay on the record at $0, honestly. Deliberately not a scheduling app — it's the money book those apps don't keep.

$16Excel & Google Sheets · visit log + per-client balances + mileage engine + books · .xlsx
Photography Business Kit — the file
New

Photography Business Kit

The working photographer's whole back office in one file — the thing the bookkeeping spreadsheets and the client trackers each do half of. A booking book where every session carries its deposit, balance, and the flag that runs your week (COLLECT in red for delivered galleries still owed; EDIT & DELIVER in amber for the desk queue). Packages priced on the honest denominator — shoot hours PLUS editing hours — where the sample's full-day wedding books the most money and pays the worst hour on the menu. Clients fill themselves; expenses and a mileage log at your own rate keep April painless. Works as-is for videographers. A record-keeping tool, not tax advice.

$19Excel & Google Sheets · booking book + packages + clients + mileage · .xlsx
Project Closeout & Punch List Kit — the file
New

Project Closeout & Punch List Kit

A construction punch list that rolls itself up: log each item once and the dashboard shows percent complete, open work by trade, what's overdue, and where your closeout deliverables stand — warranties, O&M, as-builts, permits. Four tabs, pure formulas, no macros.

$22Excel · punch list + closeout log + dashboard · .xlsx
Property Manager Workbook — Owner Statements + Multi-Property Books — the file
New

Property Manager Workbook — Owner Statements + Multi-Property Books

Books for managing other people's rentals: a property + owner register, income and expense logs with auto owner and fee lookups, and the engine generic spreadsheets don't have — pick an owner and a month and the owner statement generates itself, down to NET DUE TO OWNER. Six tabs, pure formulas, no macros.

$27Excel & Google Sheets · books + auto owner statements · .xlsx
PTA / PTO Treasurer Kit — the file
New

PTA / PTO Treasurer Kit

The treasurer's book for a parent-teacher group. One money log with a single habit — fundraiser money gets the EVENT tag, program spending gets the COMMITTEE tag — and everything else fills itself: an honest P&L for every fundraiser against the goal the board voted (the Book Fair's vendor settlement shows why gross isn't net), budget vs actual by committee with amber-watch and over-budget-red, the dues roster, and a dashboard that answers what every board meeting asks: how much cash, which event carried us, which one underperformed. A record-keeping tool, not accounting or nonprofit-compliance advice.

$16Excel & Google Sheets · money log + fundraiser P&Ls + budget vs actual · .xlsx
Quarterly Estimated-Tax Planner — 2026 — the file
New

Quarterly Estimated-Tax Planner — 2026

Quarterly estimated taxes, organized instead of dreaded: an Income Tracker for your self-employment year, a Safe Harbor Planner that runs the two standard pay-in routes as plain arithmetic on numbers YOU enter (no brackets, no rates hardcoded — every percentage is an editable reference cell), a Payment Log with the four 2026 due dates and an on-track flag, and a set-aside calculator at a rate you choose. A record-keeping and planning worksheet — not tax advice; your tax professional's calculation governs.

$14Excel & Google Sheets · income tracker + safe-harbor planner + payment log + set-aside calculator · .xlsx
Rental Property Deal Analyzer — Buy & Hold — the file
New

Rental Property Deal Analyzer — Buy & Hold

The buy-and-hold analyzer with honest inputs: a contractor-grade make-ready estimate feeding your cash invested, operating expenses BOTH ways (fixed line items plus %-rule reserves for vacancy, maintenance, capex, management), then NOI, cap rate, cash flow, cash-on-cash, DSCR, GRM, and the 1% rule — each with a plain verdict. A 10-year projection compounds YOUR growth assumptions into cash flow, equity, and total return, and a 3-property comparison names the strongest candidate. A calculator — not investment advice; every number is yours.

$19Excel & Google Sheets · analyzer + 10-year projection + comparison · .xlsx
Reseller Tracker — 2026 — the file
New · $14

Reseller Tracker — 2026

Your whole reselling year on one dashboard — true net profit after fees and shipping, inventory on the shelf, sell-through, days to sell, and which platform is quietly earning the most. eBay, Poshmark, Mercari, Depop, Etsy.

$14Excel & Google Sheets (.xlsx) — formula-only, no macros
Residential Estimating & Takeoff Workbook — the file
New

Residential Estimating & Takeoff Workbook

A quantities-first residential estimate, built the way estimators actually work: six takeoff sheets (concrete, framing, drywall, roofing, flooring, paint) that turn your dimensions into material quantities through transparent formulas — stud counts at YOUR spacing, CY with YOUR waste factor, gallons at YOUR coverage — a Materials Summary that prices every quantity at YOUR unit costs, labor at YOUR crew rates, and a real bid recap: contingency, overhead, profit markup, bid price, $/SF. No cost data claimed anywhere — every factor is a labeled, editable reference cell.

$34Excel & Google Sheets · six trade takeoff sheets + materials summary + labor + bid recap · .xlsx
Security Deposit Ledger — the file
New

Security Deposit Ledger

Track every tenant security deposit through its whole life — held, where it's held, itemized move-out deductions, and the state return deadline — so a missed return window never becomes a penalty. Pairs with the Landlord / Rental Property Tracker.

$12Excel dashboard · .xlsx
Self-Employed Tax Deduction + Mileage Tracker — the file
New

Self-Employed Tax Deduction + Mileage Tracker

For 1099 contractors, freelancers, and gig workers: log expenses by IRS Schedule C category and business miles by trip, and the workbook totals your deductions, maps them to Schedule C, and estimates the tax they save. A record-keeping tool — not tax advice.

$16Excel dashboard · .xlsx
Self-Storage Unit Tracker — the file
New

Self-Storage Unit Tracker

The small facility's ledger. Every unit's rate, tenant, and move-in date — and CHARGED accrues itself, months on the books × the rate, so each balance is honest without ever writing an invoice: red when a tenant owes, negative when they've paid ahead. The dashboard answers the three storage questions: OCCUPANCY (by size, too — which doors sell out), THE DELINQUENT, and THE VACANCY BLEED — the rent your empty doors would earn each month. What happens after a red balance (late fee, lock-out, lien) is your state statute and your lease, not this workbook. A record-keeping tool.

$14Excel & Google Sheets · rent roll + payments ledger + occupancy · .xlsx
Small-Business Bookkeeping Workbook — the file
New

Small-Business Bookkeeping Workbook

Every invoice and expense in one place — and a P&L that updates itself: an income ledger with invoice status, an expense ledger with category dropdowns, and a month-by-month dashboard with a year at a glance.

$24Excel dashboard · .xlsx
STR / Airbnb Deal Analyzer — Buy vs Rental Arbitrage — the file
New

STR / Airbnb Deal Analyzer — Buy vs Rental Arbitrage

Buy the property, or lease it and host it? One set of honest numbers runs both: a 12-month seasonal revenue model (your occupancy, your rates) and a furnish-to-launch budget feed a BUY analysis (PMT payment, cash flow, cash-on-cash, cap rate) and a RENTAL-ARBITRAGE analysis (margin, payback months) side by side. Five tabs, pure formulas, no macros.

$22Excel & Google Sheets · dual-scenario analyzer · .xlsx
STR Guest Messaging & Review-Request Pack — the file
New

STR Guest Messaging & Review-Request Pack

Eleven pre-written guest messages for the whole stay — booking confirmation, pre-arrival, check-in details, mid-stay, checkout, the post-stay review request, and four calm issue responses — plus a when-to-send-what timing cheat-sheet. Replace the blue example text with your details; works by hand, in saved replies, or pasted into any scheduling tool.

$12Editable Word (.docx) + sample PDF · Google Docs compatible
STR Guest Welcome Book — the file
New

STR Guest Welcome Book

A beautiful, fully editable house manual for your short-term rental: Wi-Fi, check-out, how everything works, house rules, your local favorites, and safety — all in one polished guidebook. Replace the blue example text with your details, delete the tips, print it or save a PDF for a QR-code digital guide. Editable Word template + a filled sample PDF.

$14Editable Word (.docx) + sample PDF · Google Docs compatible
STR Income & Expense Tracker (Airbnb / VRBO) — the file
New

STR Income & Expense Tracker (Airbnb / VRBO)

Every booking and expense across your Airbnb & VRBO listings in one workbook — with per-property P&L, occupancy, ADR, cleaning and platform fees, and net profit figured for you. Multi-property, formula-driven, no macros.

$16Excel dashboard · .xlsx
STR Supplies & Restocking Tracker — the file
New

STR Supplies & Restocking Tracker

Never run short mid-turnover. Set a par level for every supply in every property, log what's on hand, and the sheet computes the reorder quantity, the restock cost, and an OK / Reorder / Out status — with a dashboard that totals your shopping run by category and by property. Two tabs, pure formulas, no macros.

$12Excel & Google Sheets · par-level restocking tracker · .xlsx
STR Turnover Checklist — the file
New

STR Turnover Checklist

Not a static printout — a trackable turnover QA system. ~48 tasks across 8 zones, each with a critical flag and a done check, plus a live engine that shows your completion %, tasks remaining, and the critical items still open before you hand the property over. Two tabs, pure formulas, no macros.

$9Excel & Google Sheets · trackable QA checklist · .xlsx
Subcontractor COI & Insurance Tracker — the file
New

Subcontractor COI & Insurance Tracker

Every subcontractor's certificate of insurance in one register that watches the expiration dates for you — flagging who's lapsed, who's about to, and who's missing a required policy before they set foot on your site. Type the dates; the workbook tracks the rest.

$19Excel dashboard · .xlsx
Submittal & RFI Log — the file
New

Submittal & RFI Log

Two logs every project lives by — a submittal register and an RFI log on one dashboard that shows, at a glance, what's open, what's overdue, and whose court the ball is in. Type your entries; the workbook counts the rest.

$19Excel dashboard · .xlsx
T&M Extra-Work Ticket + Log — the file
New

T&M Extra-Work Ticket + Log

Document every time & material extra: a signable field ticket for labor, material, and equipment (each with its own markup), plus a running log of every ticket and a dashboard that surfaces your UNBILLED EXPOSURE — the approved work that hasn't hit an invoice yet. Four tabs, pure formulas, no macros.

$16Excel & Google Sheets · printable ticket + tracker · .xlsx
Tattoo Artist Business & Shop-Rent Books — the file
New

Tattoo Artist Business & Shop-Rent Books

The station renter's books. THE STATION ENGINE: weekly shop rent accrues itself from your start date — weeks × rate, netted against every rent payment you log — so 'am I behind on the station?' is always answered (the sample sits one week, $300, behind). A rate card that knows what each piece EARNS PER HOUR after supplies — needles, ink, barrier, aftercare — read against your target: the sample's paid touch-up runs $96/hr against a $100 target and reads red, with the price that fixes it pre-computed. A tattoo log with tips, a money-out log for inks and the license, and the number that matters: TAKE-HOME, cash in minus cash out. Works for percentage-split shops too. A record-keeping tool — your shop agreement, state licensing, and bloodborne-pathogen rules govern.

$14Excel & Google Sheets · tattoo log + rate card + station-rent engine · .xlsx
Tenant Screening & Application Tracker — the file
New

Tenant Screening & Application Tracker

Compare rental applicants side by side on the same lawful criteria — income ratio, credit, rental history, references, background — with a built-in fair-housing & FCRA checklist. It does the income math and keeps the record; you make the decision.

$12Excel dashboard · .xlsx
The Brain Dump — the file
Daily Reset line

The Brain Dump

A guided capture kit for loud minds: prompted brain-dump page, a calm four-pile sort, tiny first steps, a bedside night page, and pocket cards. From our Daily Reset line.

$8Printable PDF · US Letter
The Daily Reset — the file
Daily Reset line

The Daily Reset

A calm one-page daily planner for busy minds: brain-dump, pick just three, break down the scary task, end the day with proof. From our Daily Reset line.

$14Printable PDF · US Letter
The Monthly Reset — the file
Daily Reset line

The Monthly Reset

A calm month-ahead ritual: dump it all, pick just three things, keep one gentle habit, close the month with proof. From our Daily Reset line.

$12Printable PDF · US Letter
The Reset Family — the file
Bundle · save $17

The Reset Family

The complete Daily Reset collection — Daily, Weekly, and Monthly Resets, Gentle Goals, and the Brain Dump, with a Start Here guide. $56 separately, $39 together.

$39Bundle · 5 printable PDFs · US Letter
The Weekly Reset — the file
Daily Reset line

The Weekly Reset

A ten-minute Sunday ritual: dump the week, pick three, match heavy work to your good hours, close kindly on Friday. From our Daily Reset line.

$10Printable PDF · US Letter
Toolbox Talk Record Kit — the file
New · $4

Toolbox Talk Record Kit

Four photocopy-ready forms that turn safety talks into documentation: sign-in sheet, briefing record, meeting minutes, and a 52-week annual log. Keep the binder audit-ready.

$4Printable PDF · 4 forms · US Letter
Trucking Owner-Operator Cost-Per-Mile Kit — the file
New

Trucking Owner-Operator Cost-Per-Mile Kit

The number every owner-operator lives by, computed instead of guessed: a Load Log (loaded and deadhead miles, gross pay, rate per mile, estimated profit per load), Fixed Costs at YOUR expected monthly miles, a fuel log that turns fill-ups into MPG and fuel cost per mile, and the engine that adds it up — total cost per mile, breakeven per loaded mile, profit per loaded mile. No IFTA math, no compliance claims — every rate and escrow is yours to set.

$19Excel & Google Sheets · load log + fuel log + cost-per-mile engine · .xlsx
Tutoring Business Kit — the file
New

Tutoring Business Kit

The tutor's practice book. Every session logged once — hours × the student's rate, with per-session overrides when you need them — and everything else fills itself: each family's honest balance (billed − paid, red when they owe), and the thing bare session logs never track: PREPAID PACKAGES counted down to the hour, amber when it's time for the renew call, red when you've slipped into teaching unpaid hours. The dashboard names the mainstay, the renew call, and the invoice to send. A record-keeping tool, not tax or business advice.

$14Excel & Google Sheets · session log + prepaid packages + balances · .xlsx
Velocity Banking Calculator — the file
New · $19

Velocity Banking Calculator

Model the velocity-banking mortgage-payoff strategy with your own numbers — chunk from a line of credit, funnel your cash flow, and watch the payoff. Compared honestly, side by side, against minimum payments and plain extra principal.

$19Excel & Google Sheets (.xlsx) — formula-only, no macros
Vending Machine Route & Profit Tracker — the file
New

Vending Machine Route & Profit Tracker

The route owner's money book. A stop-by-stop route log where NET computes honestly — collected × (1 − the location's commission) − product loaded − repairs — plus a machines register with per-machine earnings and the number route owners actually chase: PAID BACK %, each machine's net-to-date against what it cost you, green at the 100% goal line. The dashboard names the earner and the laggard ('M-6 — $38 net · move it?'). A record-keeping tool, not tax or legal advice.

$14Excel & Google Sheets · route log + per-machine profit + payback tracking · .xlsx
Videographer Business Kit — the file
New

Videographer Business Kit

The working videographer's whole back office in one file. A booking book where every project carries its deposit, balance, and the flag that runs your week (COLLECT in red for delivered films still owed; EDIT & DELIVER in amber for the edit queue). Packages priced on video's honest denominator — shoot hours PLUS the edit-suite hours — where the sample's wedding film (10 in the field, 45 at the desk) books the most money and pays the worst hour. Clients fill themselves; expenses and mileage keep April painless. Two video-specific notes stated plainly: commercial drone work requires FAA Part 107, and music licensing on delivered films is yours. A record-keeping tool, not tax advice.

$19Excel & Google Sheets · booking book + packages + clients + mileage · .xlsx
Wholesale Real Estate Deal Analyzer — the file
New

Wholesale Real Estate Deal Analyzer

MAO the way it should be figured: your own comps normalized to $/sqft suggest the ARV, a contractor-grade repair quick-estimate feeds the chain, and ARV × your %-rule − repairs − your fee = the most you can offer. Then the deal side: assignment-fee scenarios at three tiers (what the end buyer pays, their margin, whether the rule still holds), a double-close cost check, and a 24-row pipeline from lead to close. A calculator — not legal or investment advice; wholesaling rules vary by state.

$16Excel & Google Sheets · deal analyzer + comps + pipeline · .xlsx
Youth Sports Team Treasurer Kit — the file
New

Youth Sports Team Treasurer Kit

The volunteer team treasurer's workbook. A per-player dues register with a fee stack (registration, uniform, extras), an honest WAIVER column, three payment slots, and live Paid/Partial/Unpaid statuses; a fundraising tracker that nets event costs (a $812 candy-bar gross that cost $390 is a $422 fundraiser — and the sheet says so); a season budget with pace flags; and a print-ready SEASON REPORT for the parent meeting: money in, money out, cash position, and who still owes. A record-keeping tool, not tax or legal advice.

$16Excel & Google Sheets · player dues register + fundraising + season budget + parent report · .xlsx